Sunday, April 18, 2010

El Fin

Finally! We got the editing done! Turned out a little different than we had planned, but due to our imaginations we were coming up with things on the fly while taping so you are bound to have some differences. We all agree that it turned out really good and are happy with the final product. We uploaded the video onto youtube and submitted the URL to Dr. Rob. All we have left to do is watch everyone else's videos!

Roll the Cameras!

Sunday April 11th:

At the meeting: Tom, Ryan, Don

Lots of ideas flowed at this meeting as this is the meeting that we decided to do our filming. We decided to add Batman as a character, which is a pretty fun twist in the story because we interview him saying that he is a long time user of Low Flow Shower Heads. Everything went smoothly as far as filming has been going and we got it all done. Now we just have to do all of the editing!!!

Monday, March 29, 2010

Ground Meeting #1: The Concept

Ryan, Don, Tom


Concept: Our video will show what Champlain College is doing to save water and energy by cutting down the water usage and using more efficient light bulbs. We will take a closer look at each of these things and show the details of how Champlain carries them out.

Sustain Champlain

  • Increased use of motion sensor lighting
  • Compact florescent light bulb exchange program
  • Installation of low flow shower heads in all residence halls which result in 30% savings
  • Modulation of boiler water temperatures
  • Regulate hot water discharge with new hot water mixing valves
  • Replacing all campus washing machines with high efficiency models.


Washing Machines


Motion Sensors


Low Flow Shower Heads



Roles

Tom - Editing
Ryan - Director
Don - Filming

Monday, March 22, 2010

The beginning of it all...

D!RT Productions

Ryan Hollowell
(978)729-2925
Ryan.Hallowell@mymail.champlain.edu

Don Maynard
(802)688-5013
Donald.Maynard@mymail.champlain.edu

Tom Lyga
(315)729-1881
Thomas.Lyga@mymail.champlain.edu